Ep 56 - Lean Practices in Complex Projects: Challenges and Opportunities - Production System Design, Last Planner, Location Based Planning and Control

Ep 56 - Lean Practices in Complex Projects: Challenges and Opportunities - Production System Design, Last Planner, Location Based Planning and Control

Em Construção

25/06/2025 11:22AM

Sinopse do Episódio "Ep 56 - Lean Practices in Complex Projects: Challenges and Opportunities - Production System Design, Last Planner, Location Based Planning and Control"

In this episode, we’ll explore these three fronts as applied to complex environments — with multiple scopes, simultaneous interfaces, and tight schedules — highlighting the use of tools such as BIM, Gantt charts, Line of Balance, 360° cameras, multidisciplinary daily hubs, and integrated big rooms. We’ll also discuss the challenges of leadership and resource allocation in dynamic settings, and how well-executed Lean practices can lead to real gains in productivity, control, and value delivery to the client. To talk about the subject, we have with us the Lean Consultant and Innovation Director at LD Consulting Fabrício Vargas

Ouvir "Ep 56 - Lean Practices in Complex Projects: Challenges and Opportunities - Production System Design, Last Planner, Location Based Planning and Control"

Mais episódios do podcast Em Construção


Warning: Attempt to read property "ID" on null in /var/www/pt.zarza.com/public_html/wp-content/themes/sahifa/framework/functions/theme-functions.php on line 1932

Warning: Attempt to read property "post_content" on null in /var/www/pt.zarza.com/public_html/wp-content/themes/sahifa/framework/functions/theme-functions.php on line 1948

Deprecated: preg_replace(): Passing null to parameter #3 ($subject) of type array|string is deprecated in /var/www/pt.zarza.com/public_html/wp-content/themes/sahifa/framework/functions/theme-functions.php on line 1457